The front of the house in 2012 |
|
|
Starting the stonework for the porch - the footings were dug a few months earlier by the postman and his mate... |
|
|
The finished porch - taken in December 2014 (it was finished 2 years before this photo was taken) |
|
|
The rear of the house in 2013 |
|
|
Another view showing the rear of the house in 2013 |
|
|
2013 The leaking roof gets removed |
|
|
The old roof is now removed and the main roof is stripped back with the new layboards and timber double pitched roof installed |
|
|
The stone mason lays out the stonework for the new gable on the kitchen - ready to be built |
|
|
The new roof, gable end and roof light all in - we also removed the large window and replaced it with French Doors and side windows |
|
|
July 2013 the digging starts to make way for the two two-storey extentions (one two stories above ground and one with one storey below ground) |
|
|
A and Frazer digging out for the extension |
|
|
M and F digging |
|
|
The Meat cellar collapses in so we decide to dig out the cellar and make a bigger basement. |
|
|
Claus tries his hand at digging - the horrid concrete path running along the garden is broken up and ready to be removed. |
|
|
To save around £25k we decided to dump the spoil, from excavating the extension, around the garden to level it out (1000 tons of spoil were removed) |
|
|
View from the now dug out meat cellar looking up at the old back door - the block work below the door is the garage wall built in the 1960s early 1970s |