21st September 2013 - basement dug out, base blinded, dpm in, concrete base laid and walls start to go up. Final removal of the rock in the background, we hit a purple seam of rock - took a lot of breaking. |
|
|
TThe snug slab being poured - concrete mixer lorry parked outside the front of the house, which is connected to a pump that pumps the concrete through the basement |
|
|
5th December 2013 - The rock has been completely removed, the site has been blinded, dmp, radon capture in, concrete base poured and the walls to the snug start to go up. |